Sale!

VMIVME-7455 General Electric

¥666.00

VMIVME-7455 General Electric
Brand: General Electric
Name: Module
Current: 5A
Voltage: 24V
Mode of use: Hot plug implementation
standard: Import
origin: United States

Category:
  • Email:3221366881@qq.com
  • Phone:+86 17750010683
  • Whatsapp:+8617750010683

Description

VMIVME-7455 General Electric
VMIVME-7455 General Electric
Module Clips Drive controller servo motor
Contact: Mr. Lai
Wechat:17750010683
Whats app:+86 17750010683
Skype:+86 17750010683
QQ: 3221366881
3221366881@qq.com

Detailed explanation of scaling causes and treatment methods of steam turbine condenser
Condenser equipment is an important part of steam turbine unit. Its working performance directly affects the safety, reliability, stability and economy of the whole steam turbine unit. The vacuum degree of condenser is an important indicator of steam turbine operation, and also a major assessment indicator reflecting the comprehensive performance of condenser. The vacuum level of the condenser has a direct impact on the economy of the steam turbine generator unit, and in serious cases, directly affects the generating load of the unit. Therefore, keep the condenser in good operating condition and ensure the most favorable vacuum of the condenser; It is an important part of energy saving in power plants.
1、 Equipment overviewVMIVME-7455 General Electric
Two sets of 12MW medium-temperature and medium-pressure condensing steam turbine generator units in a certain plant have the following condenser parameters:
Model: N-1000-7 Type: split two-pass surface type
Cooling area 1000m2 Cooling water volume 3000/h
Maximum allowable water pressure in the water chamber: 0.34MPa Water resistance: 265kPa
Net weight: 22.2t Operating weight: 35.8t
Specification of cooling stainless steel pipe: 20 * 0.7 * 4562mm
Quantity: 3540 pieces Material: 304
2、 Operation status
The vacuum of steam turbine is gradually low during operation, the vacuum value is gradually reduced from – 88 kpa to – 77 kpa, the end difference is increased from 11 ℃ to 34 ℃, the circulating water supply temperature is less than 30 ℃, the circulating water volume is more than 6000 m3/h, the circulating ratio is more than 60, and the circulating water temperature and flow fully meet the operation requirements. The long-term low vacuum operation will affect the efficiency of the unit. If the vacuum continues to decrease, it will threaten the safe operation of the unit. In order to ensure that the unit operates within the safe range, the load of the generator is reduced, with the maximum load of 80% of the rated load, which seriously affects the efficiency of the unit.
3、 Existing problems and cause analysis
The main characteristics of condenser vacuum drop are as follows: 1. The exhaust steam temperature rises; 2. Condensate supercooling increases; 3. The indication of vacuum gauge decreases; 4. The condenser end difference increases; 5. The unit vibrates; 6. Under the condition that the opening of the regulating valve remains unchanged, the load of the steam turbine decreases.
Cause analysis of condenser vacuum drop: the causes of condenser vacuum drop of steam turbine can be roughly divided into external causes and internal causes: external causes mainly include interruption or insufficiency of circulating water volume, rise of circulating water temperature, interruption of rear shaft seal steam supply, failure of air extractor, etc; Internal causes mainly include full water (or rising water level) of condenser, scaling of condenser, deterioration of heat transfer, tightness of condenser vacuum system, air inflow caused by steam side leakage, etc. The most common cause is the scaling in the condenser tube, which is mainly biological slime and carbonate hard scale, and some are phosphate and silicate hard scale. Condenser scaling seriously affects the condensation effect, and affects the end difference, vacuum degree and power generation. Scaling shortens the service life and normal output of condenser equipment. If the scale of condenser tube reaches 0.3 mm, the efficiency of steam turbine will be affected; More than 0.5mm can affect the output of steam turbine, and corrosion leakage is mainly caused by scaling of circulating water. Scaling leads to a significant reduction in the working efficiency of the condenser and affects the operation economy and safety of the unit.
From the analysis of operation, it is judged that it is caused by condenser scaling; Take advantage of the turbine maintenance opportunity, open the condenser manhole, check the condenser cooling water pipe, check that the scaling thickness of the upper condenser cooling pipe is greater than 1mm, and the lower part is gradually reduced to 0.5mm (the reason is that the upper condensed steam temperature is high, and the lower condensed steam temperature has decreased), and the water outlet side is significantly more serious than the inlet side.
Causes of scaling of steam turbine:
1. The design rated steam exhaust load of the power generation condenser is 50/h, the current steam exhaust load is 58-64 t/h, and the overload operation is nearly 20%.
2. The low-pressure heater is out of operation according to the requirements of the boiler, and~5t/h of steam that should have entered the low-pressure heater enters the condenser, causing the condenser to overload.
3. Since the boiler requires the main steam pressure not to be higher than 3.7MPa, the steam pressure sent to the steam turbine is only 3.2MPa, which is 3.42MPa lower than the design rated pressure. At the rated load, 2tVh more steam is consumed, and the condenser load is increased by 2t/h.
4. In order to complete the power generation, the unit load is controlled at 12.5MW, which consumes 2tVh more steam than the rated 12MW, and the condenser load is increased by 2t/h.
5. The increased steam intake of the above items will further affect the vacuum reduction of the condenser. Under the requirement of ensuring that the unit is loaded, the steam intake will also increase relatively, forming a reverse cycle, which will also cause the end difference to rise.
6. The supervision of circulating water quality is not in place, and the turbidity and concentration ratio increase frequently. The working environment of the cooling tower is poor, the water turbidity is high, the system evaporation is large, the concentration is fast, and the sewage discharge is small. Insufficient dosage of bactericide, scale inhibitor and dispersant and high hardness of source water will cause scaling of condenser cooling pipe.
4、 Solution
Condenser scaling cleaning methods are divided into physical cleaning and chemical cleaning. Physical cleaning usually adopts four methods:
1. Manual poking and washing. It is a manual reciprocating stabbing and brushing of the condenser tube with a stabbing bar. In order to remove the scale in the pipe, because it is only manual poking and washing, only soft scale and a small amount of hard scale can be removed, which is not thorough and labor intensive, and cannot achieve satisfactory results. Moreover, the mechanical damage to the cooling water pipe is relatively serious, and the old scale that has not been removed is used as crystal nucleus, which accelerates the scaling speed; 2. Rubber ball cleaning. It adopts the way of parallel connection between rubber ball system and circulating water system. It needs to be put into use frequently, but only soft scale can be removed, which can not play a role in the formation of hard scale.
3. High pressure water jet cleaning. This kind of cleaning effect is good. It uses high pressure water spray to remove most of the dirt in the pipe through the pipeline of the equipment to be cleaned. However, due to high labor intensity, low descaling rate, long cleaning time, high pressure causes serious mechanical damage to condenser tubes.
4. Chemical cleaning of condenser scaling. The main purpose of chemical cleaning is to remove calcium carbonate scale on the surface of condenser. Chemical cleaning of condenser has the following advantages: First, the effect of removing hard scale is good, and the rate of chemical cleaning is high. Chemical cleaning can achieve the goal of completely removing dirt, and its scale removal uniformity is consistent, and the effect is good. 2、 The cleaning time is short. Because the main components of the fouling on the condenser copper pipe are carbonate and sludge, the chemical cleaning method is applied, which has short cleaning time and simple process.
After comprehensive evaluation, it is decided to adopt chemical cleaning method. The specific scheme of chemical cleaning is:
The main process of circulating water system cleaning: descaling treatment → water replacement → hanging solid agent
Chemical cleaning agent dosage:

 

ABB DI651 电源模块 模块
ABB DI93a HESG440355R3 原装进口模块 现货
ABB DO620 工作原理 模块
ABB DP620 PLC 模块
ABB DSDI452 CPU处理器 欧美进口
ABB DSDX451 工作原理 库存备件
ABB DSDX452L IO模块 库存备件
ABB DSDX453 IO模块 欧美进口
ABB DSDX454 PLC控制器 库存备件
ABB DSMB-02C 3AFE64666606 控制板 现货供应
ABB DSPC174 3BSE005461R1 处理器板 CPU
ABB IEMMU11 处理器模块 全系列
ABB IIMCL01 数字输出模块 进口备件
067442-003通讯模块 控制器模块 原厂库存停产型号
07DC91C GJR5251400R0202
ABB IMDSI12 PLC 全系列
07EA90-SI GJR5251200R0101
ABB IMDSI22 I/O模块 进口备件
ABB IMFEC11 数字输出模块 全系列
ABB IMMFP12 数字输出模块 全系列
长期销售IS220PVIBH1A欢迎采购
ABB INNPM12 电源模块 全系列
ABB INSOE01 CPU 进口备件
ABB IPMON01 CPU 全系列
ABB NTAI05 PLC 进口备件
ABB NTAI06 输入输出模块 全系列
ABB NTCL01 电源模块 进口备件
ABB PHARPS03000000 PLC控制器 欧美进口
ABB P-HA-RPS-320000 电源模块 库存备件
ABB PHARPS32000000R 电源模块 库存备件
ABB PHARPS32200000 工作原理 欧美进口
ABB PHARPS-CH100000 工作原理 欧美进口
ABB REF615E-D HBFDACADANB1BNN1XD 7700059450
ABB 板卡 DASA110 3ASC25H705/7 工作原理 数字输出板
ABB 板卡 DATX131 3ASC25H215 CPU 数字输出板
ABB 板卡 DSBC111 57310256-K CPU 数字输出板
ABB 板卡 DSDX451L 电源模块 数字输出板
ABB 板卡 DSDX454 5716075-AT 工作原理 数字输出板
ABB 板卡 DSMB114 57360001-MG 电源模块 数字输出板
ABB 板卡 DSTC120 57520001-A PLC 数字输出板
ABB 芬兰 3BHB007211R0103 通讯模块 诚信经营
ABB 芬兰 3HAC029818-001 DSQC663 PLC DCS 模块 备件
ABB 芬兰 408368B IAM MODULE PLC DCS 模块 备件
ABB 芬兰 DSDO115A 3BSE018298R1 PLC DCS 模块 欧美进口
ABB 芬兰 DSMB-01C 3AFE64691929 PLC DCS 模块 诚信经营
ABB 芬兰 PM783FB0 PLC DCS 模块 库存备件
ABB 芬兰 PPC902AE101 3BHE010751R0101 控制器模块 卡件 诚信经营
ABB 芬兰 V4550220-0100 控制器模块 库存备件
ABB 瑞典 64711245C 控制器单元 库存备件
ABB 瑞典 CI855-1 控制器单元 欧美进口
ABB 瑞典 CM577-ETH 1SAP170700R0001 通讯模块 卡件 欧美进口
ABB 瑞典 HIEE401782R0001/LTC391AE01 PLC DCS 模块 库存备件
ABB 瑞典 NBRA-659C 59006436 通讯模块 没有中间商
ABB 瑞典 PFEA113-65张力控制器 欧美进口
ABB 瑞典 PFTC101X 张力控制器 库存备件
ABB 瑞典 PM511V16 3BSE011181R1 通讯模块 卡件 欧美进口
ABB 瑞典 PPC907BE 控制器模块 卡件 没有中间商
ABB 瑞典 RAIO-01 通讯模块 卡件 欧美进口
ABB 瑞典 UAC383AE01 控制器单元 没有中间商
ABB 瑞士 07KR264 控制器模块 备件
ABB 瑞士 086371-502 控制器模块 备件
ABB 瑞士 086388-001 PLC DCS 模块 欧美进口
ABB 瑞士 3BSE002348R1/SB511 控制器模块 卡件 备件
ABB 瑞士 3BSE042235R2 控制器模块 卡件 欧美进口
ABB 瑞士 57160001-KX 通讯模块 诚信经营
ABB 瑞士 APOW-01C 控制器模块 卡件 备件
ABB 瑞士 HIEE300888R0002 控制器模块 备件
ABB 瑞士 PFRA101 通讯模块 备件
ABB 瑞士 PM856K01 控制器模块 库存备件
ABB 瑞士 SA9923A-E 控制器模块 卡件 诚信经营
ABB 瑞士 T2N160/LSIR633P380V63A 控制器模块 卡件 备件
ABB TU830V1 3BSE013234R1 CPU模块 控制器
ABB机器人电源模块 DSQC661 3HAC026253-001 备件
ABB瑞士 L1370C 控制器模块 CPU模块
ABB瑞士 PCD232A 控制器模块 CPU模块
ABB瑞士 PCD235A101 控制器模块 CPU模块
ABB瑞士 SD821 3BSC610037R1 控制器模块 IO模块

 

Company advantage service:
1.Has been engaged in industrial control industry for a long time, with a large number of inventories.
2.Industry leading, price advantage, quality assurance
3.Diversified models and products, and all kinds of rare and discontinued products
4.15 days free replacement for quality problems
All kinds of module card driver controller servo motor servo motor embedded card wires and cables Power module control module is applicable to steel, hydropower, nuclear power, power generation, glass factory, tire factory, rubber, thermal power, paper making, shipping, navigation, etc

ABB — AC 800M controller, Bailey, PM866 controller, IGCT silicon controlled 5SHY 3BHB01 3BHE00 3HNA00 DSQC series
BENTLY — 3500 system/proximitor, front and rear card, sensor, probe, cable 3500/20 3500/61 3500/05-01-02-00-001 3500/40M 176449-01 3500/22M 138607-01
Emerson — modbus card, power panel, controller, power supply, base, power module, switch 1C31,5X00, CE400, A6500-UM, SE3008,1B300,1X00,
EPRO — PR6423 PR6424 PR6425 PR6426 PR9376 PR9268 Data acquisition module, probe, speed sensor, vibration sensor
FOXBORO — FCP270 FCP280 FCM10EF FBM207 P0914TD CP40B FBI10E FBM02 FBM202 FBM207B P0400HE Thermal resistance input/output module, power module, communication module, cable, controller, switch
GE —- IS200/215/220/230/420 DS200/215 IC693/695/697/698 VMICPCI VMIVME 369-HI-R-M-0-0-E 469 module, air switch, I/O module, display, CPU module, power module, converter, CPU board, Ethernet module, integrated protection device, power module, gas turbine card
HIMA — F3 AIO 8/4 01 F3231 F8627X Z7116 F8621A 984862160 F3236 F6217 F7553 DI module, processor module, AI card, pulse encoder
Honeywell — Secure digital output card, program module, analog input card, CPU module, FIM card
MOOG — D136-001-007 Servo valve, controller, module
NI — SCXI-1100 PCI – PXIE – PCIE – SBRIO – CFP-AO-210 USB-6525 Information Acquisition Card, PXI Module, Card
Westinghouse — RTD thermal resistance input module, AI/AO/DI/DO module, power module, control module, base module
Woodward — 9907-164 5466-258 8200-1300 9907-149 9907-838 EASYGEN-3500-5/P2 8440-2145 Regulator, module, controller, governor
YOKOGAWA – Servo module, control cabinet node unit

Main products:
PLC, DCS, CPU module, communication module, input/output module (AI/AO/DI/DO), power module, silicon controlled module, terminal module, PXI module, servo drive, servo motor, industrial display screen, industrial keyboard, controller, encoder, regulator, sensor, I/O board, counting board, optical fiber interface board, acquisition card, gas turbine card, FIM card and other automatic spare parts